- Power nets opens
- Power nets shorts
- No of stripes
- Set to set distance
- Ring width
- Which metal layers are used for power route (For ring and stripes)
- Power hook up was done are not
- Early rail analysis
- Electro migration and IR drop analysis only for power nets
Search This Blog
Subscribe to:
Post Comments (Atom)
What is the sanity checks you have done for STA?
Sanity checks for STA: Linking Checks: We need to check., is there any missing modules or missing pins in a library. this is done by link c...
-
Sanity checks for STA: Linking Checks: We need to check., is there any missing modules or missing pins in a library. this is done by link c...
-
Congestion Congestion : If the number of routing tracks available for for routing in one particular area is less than the required ro...
-
Report_annotated_delay Annotated delay means To set cell/net delay. To set a cell delay, specify the delay from a cell input to an outpu...
No comments:
Post a Comment